    Summary


    Threshold studies have been completed.
    During  Sunday Owl  we took LH2 production data at 40 uA (1 h,  IHWP=IN).
    On Sunday morning , we decided that we should also take some data with Hall C off to measure the HallA + B leakage as a function of time. These are short runs as we use only the lumis.
    During that time intense negociations were done with different parties in order to get approved a signnificant time with Hall A off.

    GMS is still off.
     


    Significant News


    On Saturday Owl, we have had the opportunity to do a leakage measurement of Hall B, with Hall A off.  We divided the time in  two 4-hours period:

    Short term Plans

    There will be two types of running periods: without and with Hall A. In all cases we use the following settings

    SETTINGS TO BE USED WHEN RUNNING WITH NO CURRENT IN HALL C

    Longer term Plan