Log entry time 17:09:30 on April 28, 2004
Entry number 83477
keyword=RC Report, Wednesday April 28
Run Coordinator's Report for 27 April Owl to 28 April Swing
Summary
Tuesday and Wednesday were quiet.
We have been running on 10uA, LH2 target for dead-time and background
tests and now
return to 40uA, LH2 Production running.
The IHWP is IN, Moller measurement complete:
Moller
Summary
Average for 10 uA atten. setting is: -73.93 +/- 0.42 %
Average for 40 uA atten. setting is: -74.29 +/- 0.52 %
Short term Plans
- Continue with 40 uA LH2 production data.
Longer term Plans
- Moller/IHWP insertion/Moller every three days. (Next one
Saturday Maybe)
- Sometime this weekend (Saturday most likely) we will begin 15uA
beam on Aluminum frame running. This will continue to Monday Beam
studies.
- During Beam Studies on Monday/Tuesday; please inform J. Beaufait
& B. Vulcan if controlled access available for work on SOS.
Concerns
- Watch beam and feed back stability. Also note any changes
to the increased 'Lumi' widths.