    Run Coordinator's Report for 22 April Owl to 23 April Swing


    Summary

    After recovery from yestesterday's Magnet quench,  We have had a quiet night and day of LH2 production data.
    MCC needed an injector access to replace autistic trim cards.
    Beam is more stable following yesterdays investigations by MCC.
    Energy Measurement done.
    Remainder of run outlined in morning RC meeting.  See below.


    Significant News

    Beam Stability:  Yesterday we gave beam to MCC to investigate the cause of high trip rate.  Reza performed an
    injector optimization but this did not cure the problem, but helped to isolate the trouble to 3 RF cavities which were
    unstable.  These cavities were bypassed and rest of machine gradients adjusted to compensate.  Trip rate is way down.

    Lost a signal to Oct 7, Det 8 FL.  We will send in a replacement team if/when beam gone for significant time.

    A great increase in halo (10-20kHz) was traced to energy instabilities in the accelerator.  After phoning MCC, they "tweaked" the
    energy a bit and halo rate dropped back down to about 3kHz.


    Short term Plans




    Long Term Plans... Tentative Schedule... G0is4evR.

    To help answer lingering questions, the discussions settled out with

    10uA, LH2 Running:  Need 48 "beam" hours (24 data/tape hours) .

    Aluminum Frame data: Need 48 beam hours (24 data/tape hours) .


    Target Boiling study: Need 4 hours.


    Transverse Polarization running.
        For this we have a slight extension in the run:  This moves our 'end date' to Thursday, May 13.  In exchange we will give
        Rolf a shift or two of Detector tests involving the pivot target and an SOS move.
        Also required will be to establish the desired launch angle, a moller run (or two), and probably a mini spin dance.

    Tentative  Schedule of this is below.

    Monday Tuesday
    Wednesday
    Thursday
    Friday
    Saturday
    Sunday

    19

    20


    21

    22

    23
    Day
  • LH2 LH2 Production Run

  • Swing
  • LH2 Production Run


  • 24
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run
    25
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    • Moller + 1/2 wave plate
    Swing
    • LH2 Production Run


    26
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run

    0900 Beam studies 1200
    We need 48 beam hours of 10uA, LH2 Back-ground data.
    • 10 uA, LH2
    Swing
    • 10 uA, LH2

    27
    Owl
    • 10 uA, LH2
    Day
    • 10 uA, LH2

    0900 Beam studies 1200
    • 10 uA, LH2
    Swing
    • 10 uA, LH2
    28
    Owl
    • 10 uA, LH2
    Day
    • 10 uA, LH2

    0900 Beam studies 1200
    • ?? Moller + 1/2 wave Plate
    • 10 uA, LH2
    Swing
    • 10 uA, LH2

    29
    Owl
    • LH2 Production Run
    Day
    • ?? Moller + 1/2 wave Plate
    • LH2 Production Run
    Swing
    • LH2 Production Run

    30
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run

    1
    Owl
    • LH2 Production Run
    Day
    We need 48 hours Al Frame data.
    • Al Frame Data
    Swing
    • Al Frame Data

    2
    Owl
    • Al Frame Data
    Day
    • Al Frame Data
    Swing
    • Al Frame Data


    3
    Owl
    • Al Frame Data
    Day
    • Al Frame Data


    • Target Boiling studies (4 hours)
    Swing
    • LH2 Production Run

    4
    owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run

    5
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run

    6
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run

    7
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run

    8
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run

    9
    Owl
    • LH2 Production Run
    Day
    • LH2 Production Run
    Swing
    • LH2 Production Run


    10
    Owl
    • LH2 Production Run
    Day
    • Setup for transverse polarization


    • Moller
    • Transverse running

    Swing
    • Transverse running
    11
    Owl
    • Transverse running
    Day
    • Transverse running


    • Transverse running
    Swing
    • Transverse running

    12
    Owl

    • Transverse running
    Day
    • Transverse running


    • Transverse running
    Swing
    • Transverse running

    13
    Owl
    • Transverse running
    Day
    • Tran severs running




    14

    15

    16




    The End



    A copy of this log entry has been emailed to: beck@jlab.org