    Run Coordinator's Report for 10 April Swing to 11 April Swing

    Summary

    LH2 production running. Finish DNL with YO signal studies. Terrible beam conditions begin in early morning: energy instabilities again.
     

  • Significant News

    Plans

     
  • If the beam energy is stable enough, we would like to attempt another energy modulation run sometime during the 20:00-4:00 shift. Make sure MCC gives Hall C control of the Emod, and MAKE SURE MCC HAS ALL E-LOCKS AND E-FEEDBACK SYSTEMS OFF.
  • Continue with LH2 production running until Monday at 7:00 when the maintenance period begins.
  • Monday morning, we will boil away the LH2 target, but keep it at 30 K. We will also ramp down the SMS to put both systems in a stable state over the maintenance.
  •  We are now on our official 3 day cycle for Moller measurements/IHWP state changes.

  •  

    Concerns