Run Coordinator's Report for 10 April Swing to 11 April Swing
Summary
LH2 production running. Finish DNL with YO signal studies. Terrible beam
conditions begin in early morning: energy instabilities again.
Significant News
-
Joachim Kuhn takes over as Run Coordinator as of Monday 7:00 AM.
-
IHWP still IN.
-
Potentially odd Hall B bleed through effect observed at around 5:45. Beam
to Hall C off, yet BPM's reading finite values. MCC closes Hall B slits,
and readings go away.
-
During the early morning hours (~5:00), beam steering and tuning problems
get severe. Energy instabilities again. The instabilities are so bad that
MCC can't deliver more than 36 uA to the hall without very frequent Hall
C Ion Chamber induced beam trips. Target operator sees temperature in our
tungsten radiator spike, indicating the beam is actually hitting the
radiator.
Analysis shows that helicity correlated energy differences during this
beam period are ~ 600 eV, while our spec is 75 eV. Things are bad. This
MUST be fixed during the maintenance.
-
Lumi 7 still not working properly. Still not clear what the cause is, but
some ideas should be floated around, and next Monday's maintainance day
would be a good opportunity to implement them.
-
DMCH Interface box is the "new" box, and 120 Hz mode still does not
work for French electronics. A new procedure for 120 Hz running will be
to set acquisition mode to TS_Scaler rather than TS2_full.
-
Analysis and worker shift personnel seeing many crashes in cdaql1.
Paul has requested that these positions generate a shiftly log of how
oftern
and when these crashes occur. These do not have to be log entries the
moment
the crash occurs, but at the end of your shift, make one log entry which
summarizes the crashes.
-
A Damon analysis for all of the data since the change to 4 pass running
shows that the BCM monitors in the hall are showing charge asymmetries
that are not zero at about the 3 sigma level. We should resurrect the
Injector
DAQ and measure the charge asymmetries there during the same time as we
are running in the hall to see if the same effect is present in the
injector,
or these are caused by some differential scraping down stream of the
injector
entrance to the accelerator. (Volunteers?) However, due to the Hall A
turn
on, if Hall A beam is being delivered, the charge asymmetry in the
injector
is a combination of both Hall A and Hall C charge asymmetries. This may
only be useful for us if Hall A has no beam delivered to them.
-
We will be down for all day Monday, and through Day shift on Tuesday.
This
means that worker and leader shifts will not need to be manned from 8:00
Monday through 16:00 Tuesday. We will need one target expert on Monday
morning to boil away the target and put it in a safe state at 30 K. When
to fill the target again (either Tuesday Swing or Wednesday
morning)
will be determined by the promise of beam and when we can expect it back
in the hall. This decision will be made Tuesday afternoon. We will also
need a SMS expert on Monday morning to ramp down the magnet and put it
in a safe state for the shutdown.
Plans
If the beam energy is stable enough, we would like to attempt another
energy modulation
run sometime during the 20:00-4:00 shift. Make sure MCC gives Hall C
control
of the Emod, and MAKE SURE MCC HAS ALL E-LOCKS AND E-FEEDBACK SYSTEMS
OFF.
Continue with LH2 production running until Monday at 7:00 when the
maintenance
period begins.
Monday morning, we will boil away the LH2 target, but keep it at 30 K.
We will also ramp down the SMS to put both systems in a stable state over
the maintenance.
We are now on our official 3 day cycle for Moller measurements/IHWP
state changes.
Concerns
-
Spikes in French electronics
-
Non-statistical widths in detectors 13 and 14 of octants 4 and 8.
-
Non-understood influence of Interface Box to DMCH's. Spare does not work
in 120 Hz mode.
-
NA LTD errors still occurring at a smaller rate. Brian has generated a
"HowTo" document (located on the G0 web page under
http://g0web.jlab.org/manual/Electronics_manuals.html)
for trouble shooting.
-
Crosstalk with target IOC and target FSD box when the Musson box is
rebooted
remotely
-
Changed behavior of BPM 3H00C Y position with respect to other hall
BPMs.
-
Lumi 7 issues.
-
cdaql1 also crashing at a pretty regular rate.
-