• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name spwells

    Log entry time 16:46:23 on April 08, 2004

    Entry number 81796

    keyword=RC report for 7 April Swing through 8 April Day

    Run Coordinator's Report for 7 April Swing to 8 April Swing

    Summary

    Laser spot moved on crystal, and some injector retuning. Encouraging news is that the PZT/IA feedback parameters did not change significantly despite these rather drastic injector changes, or at least feedback is still operational after these changes. The Hall A IA Pockel's cell has been realigned, and generates injector charge asymmetries large enough such that both Hall C and Hall A charge asymmetries can be nulled. We should now be on cruise control to take LH2 production running through the remainder of the weekend until the maintenance period Monday and Tuesday.
     
     

  • Significant News


    Plans


     
  • Continue with LH2 production running through Saturday morning.
  • Run Moller/IHWP insertion/Moller sometime Saturday morning (Damon will set the time, and come in to make the measurements).
  • After Moller measurements, BUT BEFORE PUTTING THE LH2 TARGET BACK IN, we want to run some short test runs to investigate various things.
  • 1) A 1 hour run with detectors and SMS on, but LH2 target out (effectively a "green block" run, with the YO signal in the data stream, checking for helicity correlated YO effects).
  •             - if no signals are present in the detectors, we may have to go to the HIGH GAIN HV settings to mimic the "green block" runs.
  • 2) The Halo monitors are showing some strange behavior, in that they measure a relatively large asymmetry (~50 ppm) in one helicity state but not the other. We would like to address the impact of this on what the      FPD's are seeing. Mark and Sarah have outlined a program to investigate this, and some of this can be performed with the LH2 target out immediately after the "green block with YO" run described above.
  • Continue with LH2 production running until Monday at 7:00 when the maintenance period begins.
  •  We are now on our official 3 day cycle for Moller measurements/IHWP state changes.

  •  

    Concerns