    keyword=Run Coordinators Report for 6 April Swing through 7 April Day

    Run Coordinator's Report for 6 April Swing to 7 April Swing

    Summary

    LH2 production running during Swing, up until MCC takes beam for beam studies and Hall A shake down at 17:00.  MCC successful at getting 100 uA of beam into Hall A switchyard dump, but Hall A vacuum problems prevent them from tuning into the hall. So, we win, and get beam back 2 hours earlier than expected. LH2 production running over night and early into the Day shift.  Coordination with MCC and the injector group regarding the laser spot move on the crystal dicates that we perform our Moller measurements at 10:00, remove the IHWP, and still time for another Moller measurement before MCC takes beam for beam studies. After beam studies are complete, injector group will move the laser spot, and tune beam into our Hall.
     
     


  • Significant News


    Plans

  • After beam is back after laser spot move, we need to perform a Moller measurement.
  • After beam is back into the Hall, we need to perform a RHWP scan to zero out the charge asymmetry. Start taking LH2 production data. CHECK THAT IA/PZT FEEDBACK IS CONVERGING AND IS       OPERATIONAL! If not, run a RIP scan to get new feedback parameters and get the feedback to work satisfactorily. THIS IS VERY POSSIBLE DUE TO THE LASER SPOT MOVE AND WHATEVER INJECTOR RETUNING OCCURED AFTER THIS MOVE.
  • Continue with LH2 production running through Owl shift.
  •  We are now on our official 3 day cycle for Moller measurements/IHWP state changes.

  •  

    Concerns