LH2 production running during Swing, up until MCC takes beam for beam
studies and Hall A shake down at 17:00. MCC successful at getting
100 uA of beam into Hall A switchyard dump, but Hall A vacuum problems
prevent them from tuning into the hall. So, we win, and get beam back 2
hours earlier than expected. LH2 production running over night and early
into the Day shift. Coordination with MCC and the injector group
regarding the laser spot move on the crystal dicates that we perform our
Moller measurements at 10:00, remove the IHWP, and still time for another
Moller measurement before MCC takes beam for beam studies. After beam
studies
are complete, injector group will move the laser spot, and tune beam into
our Hall.