    User name arvieux

    Log entry time 21:45:47 on May 05, 2004

    Entry number 84202

    keyword=RC Daily Report 4-5 May

    Run Coordinator Daily Report for 4 May Owl to 5 May Swing

    Summary

    Completed  thresholds studies with IHWP IN
    Completed Hall B leakage studies with Hall A out (4,5 hours)
    Did a run with both Hall A and Hall B off, Hall C at 40 uA (1 hour)
    In total we had 5.5 hours of leakage  studies
    Doing further tests with Hall A (at 90 uA), Hall B and Hall C alternating 40 uA and 0 uA (j`leakage fron`m Hall A+B) as explained below

    GMS is still off.
     


    Significant News

    Hall B leakage has been measured in Hall C in the following conditions: Hall A off, Hall  B at 25 nA
    (but a few uA in the injector, a number we should keep track as Hall B leakage should depend on it),
    Hall C laser shut OFF but slit wide open (which corresponds to a current of 40 uA).
    Leakage is  2/3 of the total Hall (A + B) leakage (or about 35 nA) ,  or twice Hall A leakage which is somewhat bad news.
    Good news is that the Hall B  asymmetries  , as measured in the the Lumis (the FPD are not analyzed yet) are not so high  (500-700 ppm).
    Taken altogether the effect of Hall B is then about 1/2 the effect  of Hall A.

    After 5.5 hours of leakage tests (with Hall A off, including one hour with both Halls A and B off), we had to let Hall A (now at 90 uA)
    and Hall B have beam again.  We are presently doing stability tests of the leakage with Hall A+B on, by alternating 40 uA runs with 0 uA (leakage) runs
    in  Hall C, every hour (with IHWP IN and OUT).

    Tomorrow, Hall C crew will do detector tests for future experiments for one complete shift. During that time we'll do (essentially Jianglai) an analysis of the leakage data  presently taken. Around 14:00-15:00 we should have conclusions and be able to request further tests  if needed ,to  JLab management.
    We will most likely require at least one (or more) 4-hours period with Hall A off on Friday.

    Other tests (including tests at different Hall A intensities or running longer to compare with data taken before April 17), would require up to 3 shifts with
    Hall A off..

    The priority of target boiling studies has been lowered after Hall A leakage. They could  be done on Friday except if we get more time for leakage studies, in which case they would have be postponed on Friday or during the week-end.

    Completion of thresholds studies with IHWP=OUT will  be done during Thu Swing-Friday Owl (2 shifts).
     

    Short term Plans

    SETTINGS TO BE USED WHEN RUNNING WITH NO CURRENT IN HALL C

    Longer term Plan


     
     
     
     
     
     
     
     

    A copy of this log entry has been emailed to: beck