Run Coordinator's Report for 3 April Swing to 4 April Swing
Summary
Smooth LH2 production running over night and through the morning. Moller
measurements and insertion of IHWP during Day shift. Magnet fast dump
occurs
at around 14:00. Now in recovery mode.
Significant News
-
LH2 production running over night.
-
Moller measurements (P ~ 74.5%)
-
IHWP now IN.
-
Magnet fast dump at 14:00. Both the PLD module and the JT valve
controller
failed. Not clear which one took the other one out, but nonetheless, this
caused a SMS fast dump.
-
Took opportunity in the Hall to replace the base in Octant 4, Detector
11, FR.
-
Jainglai also took the opportunity to work on Lumi 7, which was showing
"flat" asymmetries.
Plans
LH2 production running until Monday 9:00 when MCC takes beam for beam
studies.
120 Hz runs once/day during day shift.
Concerns
-
Spikes in French electronics
-
Non-statistical widths in detectors 13 and 14 of octants 4 and 8.
-
Non-understood influence of Interface Box to DMCH's. Spare does not work
in 120 Hz mode.
-
NA LTD errors still occurring at a smaller rate. Brian has generated a
"HowTo" document (located on the G0 web page under
http://g0web.jlab.org/manual/Electronics_manuals.html)
for trouble shooting.
-
Crosstalk with target IOC and target FSD box when the Musson box is
rebooted
remotely
-
Changed behavior of BPM 3H00C Y position with respect to other hall
BPMs.
-
Discrepancy in beam current measured by BCM1/2 and the MPS BCM (This
should
be cured after the BCM calibrataion. Data have been taken, but analysis
awaits.).