    Log entry time 16:31:07 on April 01, 2004

    Entry number 81138

    keyword=RC report for 31 March Swing through 1 April Day


    Run Coordinator's Report for 31 March Swing to 1 April Swing

    Summary

    We ran pretty well overnight; vertical beam steering reduced halo rates to nominal values. Beam back very late into Day shift after beam studies and installation of Hall A laser in injector due to problems getting beam out of injector and various beamline issues.


  • Significant News


    Plans

    1. BCM Calibration.
    2. Wells plot data.
    3. RIP scans and get feedback operational.
    4. LH2 production running until 9:00 on 4/2/04 when MCC takes beam for beam studies.

    Concerns