• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Spayde

    Log entry time 22:29:56 on March 31, 2004

    Entry number 81047

    keyword=Run Coordinator's Report for 31 March Swing to 1 April Day

    Run Coordinator's Report for 31 March Swing to 1 April Day

    Summary

    We ran pretty well overnight; the odd halo rate oscillations damped out. The overall rate is still 1.5 to 2 times higher than prior to beam studies yesterday. Lost essentially the entire day shift to beam studies, HVAC repair, and polarimetry.


    Significant News


    Plans

    1. Asymmetry runs on LH2 with 40 ľA of longitudinally polarized electrons.
    2. Daily beam studies:
      • Thursday: 09:00 to 12:00 followed by 1 hour injector access. This is the last day a "Daily FOPT" test will be performed unless we request otherwise. It would probably be wise to continue this short test for several more days.
      • Friday: 09:00 to 11:00
    3. Moller, IHWP change, and RIP calibrations on Wednesday and Sunday (?)
    4. BCM calibration on Thursday
    5. Short energy modulation run [5 minutes] (?)
    6. Short Wells plot deadtime study [2.5 hrs] (?)
    7. Fastbus phototube gain calibration [6 hours] (?)

    Concerns


    Shift Summaries and BTA Reports