    User name Spayde

    Log entry time 17:16:20 on March 29, 2004

    Entry number 80784

    keyword=Run Coordinator's Report for 28 March Swing to 29 March Day

    Run Coordinator's Report for 28 March Swing to 29 March Day

    Summary

    Data taking went smoothly overnight. Day shift spent in beam studies, polarimetry, and feedback device calibration.


    Significant News


    Plans

    1. Asymmetry runs on LH2 with 40 ľA of longitudinally polarized electrons.
    2. Daily beam studies:
      • Monday to Wednesday: 09:00 to 12:00
      • Thursday to Friday: 09:00 to 11:00
    3. Moller, IHWP change, and RIP calibrations on Monday, Wednesday, and Friday after beam studies.
    4. BCM calibration (after Hall C AC repairs are complete, Friday perhaps?)
    5. Requested Test Plans
      • FastBus phototube gain calibration (6 hrs) - anytime
      • Wells plot deadtime study (5 hrs) - anytime

    Concerns


    Shift Summaries and BTA Reports