    keyword=Run Coordinator's Report for 23 March Swing to 25 March Day

    Run Coordinator's Report for 23 March Swing to 25 March Day

    Summary

    We have continued to take data with transversely polarized beam on LH2 and Al frame targets. This program will conclude tomorrow and we will return to normal, longitudinally polarized running.


    Significant News


    Plans

    1. Take data on LH2 overnight (IHWP is IN).
    2. 08:00 => Set up the Moller in preparation for the micro spin dance.
    3. 09:00 - 13:00 => Perform micro spin dance and tune longitudinally polarized beam into the hall.
    4. 13:00 - 14:00 => RIP scan and feedback device calibration.
    5. 14:00 - 16:00 => BCM/BPM calibration?
    6. 16:00 => Resume normal asymmetry running.