    Log entry time 01:25:30 on February 28, 2004

    Entry number 78052

    keyword=RC Summary Thursday 02-26-2004 Swing through Friday 02-27-2004 Day

    RC Summary Thursday 02-26-2004 Swing through Friday 02-27-2004 Day RC Summary Thursday 02-26-2004 Swing through Friday 02-27-2004 Day


     Achievements and events
    The plot below illustrates how data taking on LH2 has been going.  Each vertical bar (except the last one) represents a 24 hour day (midnight to midnight).  The last bar terminates at the end of the day shift today.  Each bar is divided into colored sections according to the time allocated to particular activities.  Data was provided by Julie's "abu" program which relies on information stored in the analysis data base, by the "beam accounting" program (for Beam Not Available (BNA) and Beam Available but Not in Use (BANU)), and the log book for Moller running.

    The purple "Other" sections include relatively infrequent activities (BPM/BCM calibrations, harp scans, high voltage calibration, beam energy measurement, etc.).  For example:
    "Other" also includes unavoidable "overhead" such as the time to stop and start runs and possibly some mislabeled BANU time.

    120 Hz running has not appeared in this plot since 02/24 due to a problem with the reporting of that data by Julie's abu program.
    LH2 Running Bar Chart
    The last 24 hour period has been characterized by very low overall efficiency (only 22.9%) due to the long periods of accelerator maintenance and the associated long recovery times.  We lost a block of a few hours (most of the BANU on 02/27) due to the magnet dump.  Short periods of beam tuning for Hall B have also had an impact.

    Plans

    Concerns and Their Resolution
    List of shift summaries

    Wednesday 02/26 Swing and ABUs
    Thursday 02/27 Owl and  ABUs
    Thursday 02/27 Day and ABUs