    RC Summary Report Saturday/Sunday 02/22 RC Summary Saturday/Sunday 02-22-2004


     Achievements during this period:
    The plot below illustrates how data taking on LH2 has been going during the past  (roughly) 10 days.  Each vertical bar (except the last one) represents a 24 hour day (midnight to midnight).  The last bar terminates at the end of the day shift today.  Each bar is divided into colored sections according to the time allocated to particular activities.  Data was provided by Julie's "abu" program which relies on information stored in the analysis data base, by the "beam accounting" program (for Beam Not Available (BNA) and Beam Available but Not in Use (BANU)), and the log book for Moller running.  The purple "Other" sections include relatively infrequent activities (BPM/BCM calibrations, harp scans, high voltage calibration, beam energy measurement, etc.).  For example, the rather large "Other" region on February 17, was mostly associated with 5.5 hr of high voltage calibration.  The large "Other" band on February 18, includes time spent on harp scans (one hour) and BCM/BPM calibrations (3 hurs).  "Other" also includes unavoidable "overhead" such as the time to stop and start runs and possibly some mislabeled BANU time.
    LH2 Data Collection
    You can draw your own conclusions from this chart.  Here are some of mine::

    Plans

    Concerns

    List of shift summaries