    keyword=(Take 10, get one free) RC Summary report Wdnesday/Thursday 02/19

    Run Plan Friday 02-06-2004Run Plan - Wednesday 01-28-2004


    RC Summary Wednesday/Thursday 02-19-2004

        Difficult to leave. As many addiction, RC one requires a smooth leaving
    ... and
    Steve let me do 1 more day writing this report;-).
        Again  mixed feeling  :-\ with goodies and bads


     
    Achievements during this period:

    1) Beam at 40 uA and running with 6 mm halo target

    2) IHWP is now IN (IHWP-IN)


    3) Feedback operation and beam parity quality

        - Feedback did not operating when beam came back during the night (Feedback-Changes)
        - Data do look good when the system is operating (see Feedback-ON)


    4) 120 Hz are being replayed by the worker (none in this period)
        - Investigation is still underway on January data  (120Hz-January)

    5) Observed IN+OUT asymmetry for present (Feb.) LH2 data
        have now quite a large statistics and allow precise tests
        and first results. Seems very close to zero.
        - see results of work going on (Analysis)

    6) G0Integrity result is now reported in an entry by the workers
        - (G0Int1G0Int2 ). 

    7) BCM calibration (BCM-Calib) and new gain for BCM1 (BCM1)

    8) Frequency of NA DNL measurements (NA-DNL)

    9) Harp scan with procedure defined (21:37) and measurement (Harp-data)

    10) Analysis going on on DMCH spikes/DT ( Spike, DT) and explanations (F-Elec)

    11) Tested the SMS backup laptop (SMS and New-Comp
    )

    On a more general basis. Mid-Term plan

    1) We will likely change the IHWP state on Saturday (2/21)

    2)  BCM calibration need to be done every week.
    3) Harp scan to calibrate BPM position in Hall C beam line
    4) Lumi scan on LH2 (asked by Silviu and Jianglai).
    5) GMS tests to be continued GMS



    Concerns


    A) ABU
    B) Information about changes at the injector level

    C) Poor efficiency in recovering after beam condition changes

    D) Puzzling situation with BPM after changes in beam setting

    List of shift summaries
     
    Wednesday Swing    W-Swing and cdaq-WeS
    Thursday
    Owl            Th-Owl and  cdaq-ThO
    Thursday
    Day          Th-Day and cdaq-Day


    Serge Kox and Steve Williamson