    Log entry time 23:22:07 on February 18, 2004

    Entry number 77017

    keyword=RC Summary (yes no hurrah today) Tuesday/Wednesday 2/18

    Run Plan Friday 02-06-2004Run Plan - Wednesday 01-28-2004


    RC Summary Tuesday/Wednesday 02-18-2004

        Back to reality. Much more mixed feeling ... :-\


     
    Achievements during this period:

    1) Beam at 40 uA and (hardly, see Halo-Rates) running with 6 mm halo target

    2) IHWP is now OUT (IHWP-OUT)


    3) Feedback operation and beam parity quality

        - Feedback did not operating when beam came back during the night (NoFeedback)
        - Data do look good when the system is operating (see Feedback)


    4) 120 Hz are being replayed by the worker ( 120Hz1120Hz2 )
        - Investigation is underway on January data
        - We may come to only one 120 Hz measurement per day.

    5) Observed IN+OUT asymmetry for present (Feb.) LH2 data is
        now not compatible with 0 (see IN+OUT) as the precision increases. 
        The effect is however smaller than in December.
        - Work is going on on various directions (Battery)

    6) G0Integrity result is now reported in an entry by the workers
        - (G0Int1, G0Int2, G0Int3). Thanks
     
    7) PMT gain calibration has been revisited
        - New HV file has been generated (HV_New)
        - Needed some refinements (Current-Limit)

    8) Results of filtered Y0 test finally appeared (Y0)

    9) Some (very) remote adjustment on French electronics (FromOrsay)

    10) Some file assignments (Runs)

    11) DNL runs (NA DNL1 and French DNL2) during beam down periods

    On a more general basis. Mid-Term plan

    1) We will likely change the IHWP state on Thursday (2/19)

    2)  BCM calibration need to be done every week.
    3) Harp scan to calibrate BPM position in Hall C beam line
    4) Lumi scan on LH2 (asked by Silviu and Jianglai).
    5) GMS tests to be continued GMS



    Concerns


    A) Several runs reported to have rate problems with French FPD/electronics
    B) Poor efficiency in recovering after beam condition changes

    C) Puzzling situation with BPM after changes in beam setting

    List of shift summaries
     