    Log entry time 23:46:17 on February 17, 2004

    Entry number 76906

    keyword=:-)) RC Summary Monday/Tuesday 02/18

    Run Plan Friday 02-06-2004Run Plan - Wednesday 01-28-2004


    RC Summary Monday/Tuesday 02-17-2004

        An excellent day of data taking ! Following Joachim suggestion,
        I should have said I am an ecstatic RC ... but what word is then left if one does even better ;-)


     
    Achievements during this period:

    1) Beam at 40 uA and running with 6 mm halo target

    2) IHWP is now OUT (IHWP-OUT)
        - Moeller measurement performed (Moeller)
        -
    Slope adjustment  (RHWP)

    3) Feedback operation and beam parity quality

        - Data continues to look pretty good (see Feedback)

    4) 120 Hz are being replayed by the worker (120Hz1, 120Hz2, 120Hz3)
        - OK, so 120 Hz only every 8 hours.
        - Investigation is underway on January data
        - We may come to only one 120 Hz measurement per day.

    5) Observed IN+OUT asymmetry for present (Feb.) LH2 data is
        about compatible with 0 (see  IN+OUT).  Work is going on.

    6) G0Integrity result is now reported in an entry by the workers
        - ( G0Int1, G0Int2, G0Int3). Thanks
     
    7) Coil modulation small problem is fixed
    (see Coil-Bug2)
        Also change the run plan to account for short trips
        (no need to re-run the script in this case)

    8) Confirmation of the increase of efficiency in data taking
        - Now > 14 hours/day, with 1-2 hours down for configuration changes
        - About 80% of efficiency for Parity quality data in production runs

    9) New update of the dataBase (DB)

    10) New suggestions to make shift worker even more busy (Summary)

    11) Thanks to a donation by Bill Vulcan, coffee and tea are available
           in the counting house again.

    12) Upset the shift worker with spelling error. Corrected by
           apologies and correction/removal of my faulty entry.

    On a more general basis. Mid-Term plan

    1) We will likely change the IHWP state on Thursday (2/19)

    2) Fastbus measurement to perform a check of the gain and
        set a reference spectra.

    3)  BPM/BCM calibration need to be done every week.

    4) Lumi scan on LH2 (asked by Silviu and Jianglai).


    Concerns

    A) PMT Gain calibration

    B) Beam trip can be  hurting us ...

    C) Several runs reported to have rate problems with French FPD/electronics

    List of shift summaries
     
    Monday Swing    M-Swing  and  cdaq-MS
    Tuesday
    Owl      Tu-OWL and   cdaq-TuO     
    Tuesday
    Day       Missing and cdaq-TuD


    Serge Kox
     Pager : 584-5681
     Cellular
    876-1791
     e-mail : kox@in2p3.fr