    keyword=(still happy) Run Coordinator Summary Saturday/Sunday 02/15

    Run Plan Friday 02-06-2004Run Plan - Wednesday 01-28-2004


    RC Summary Saturday/Sunday 02-15-2004

        Another day with good progress ... Have a look !


     
    Achievements during this period:


    1) Beam at 40 uA.

    2) We are running with 6 mm halo target and the
    rates are in fact
         improving with time and some adjustements (see Halo-improve)

    3) IHWP is now IN (IHWP-IN)
        - Moeller measurements (before and after IHWP change)
           (see Moeller)
        -  Slope adjustement performed (see NoRIP)

    4) Feedback operation and beam parity quality

        - Data continues to look pretty good (see Parity-Quality)

    5) 120 Hz are being replayed by the worker (120HzOK)
        - OK, so 120 Hz only every 8 hours.

    6) Observed IN+OUT asymmetry for February LH2 data is
        compatible with 0 (see IN+OUT)

    7) New Golden values for G0Integrity (see Golden and ADC)

    8) New PID cuts implemented (see PID)

    9) Coil pulsing data analysis
        - Correction is working fine (Correction)
        - NOTE that if you experience a beam trip during the data taking,
           the data are useless.
        - In order to save time, in case of a trip, keep the run going and
            just restart Gary's script (see Trip-coil)
        - As a clear relation was found, perform the Coil pulsing
           measurement with Halo target OUT (see Coil-and Halo)

    10) HV adjustement on 2 NA PMTs (see NA-PMT)

    11) Most of the cup and plates as well as silverwares are now
          cleaned during the runs. Thanks.


    On a more general basis. Mid-Term plan

    1) We will likely change the IHWP state on Tuesday (2/17)
          Make a RIP scan just after, and a Moeller measurement before and after


    2)  BPM/BCM calibration need to be done every week. Tentative next Wednesday.

    3) Fastbus measurement to perform a check of the gain and
        set a reference spectra. Tentative : Tuesday 2/17 after beam development

    4) Lumi scan on LH2 (asked by Silviu and Jianglai). After BCM calibration.



    Concerns

    A) PMT Gain calibration

    B) Coil modulation 
    C) Beam trip is hurting us

    D) Some confusion on fastfeedback ... After discussions and inquiries :


    List of shift summaries
     

    Saturday Swing    Sa-Swing  and cdaq-SaS
    Sunday
    Owl        Su-Owl and  cdaq-SuO            
    Sunday
    Day         Su-Day and  cdaq-SuD


    Serge Kox
     Pager : 584-5681
     Cellular
    876-1791
     e-mail : kox@in2p3.fr