User name Serge
Log entry time 17:10:08 on February 15, 2004
Entry number 76656
keyword=(still happy) Run Coordinator Summary Saturday/Sunday 02/15
Run Plan Friday 02-06-2004Run Plan - Wednesday 01-28-2004
RC Summary Saturday/Sunday
02-15-2004
Another day
with
good progress ... Have a look !
- Change to LH2 was made on
Wednesday
morning
- IHWP was OUT
since Friday afternoon
- IWHP is IN since Sunday morning
- Data taking on LH2 target with 40 uA
- 8.5 hours of LH2
target parity quality
data on tape
(runs
19892-19921)
Achievements during this period:
1) Beam at 40 uA.
2) We are running with 6 mm halo target and
the
rates are in fact
improving with time and some
adjustements (see Halo-improve)
3) IHWP is now IN (IHWP-IN)
- Moeller measurements (before and after IHWP
change)
(see Moeller)
- Slope adjustement performed (see NoRIP)
4) Feedback operation and beam parity quality
- Data continues to look pretty good (see
Parity-Quality)
5) 120 Hz are being replayed by the worker (120HzOK)
- OK, so 120
Hz only every 8 hours.
6) Observed IN+OUT asymmetry for February LH2 data is
compatible with 0 (see IN+OUT)
7) New Golden values for G0Integrity (see Golden
and ADC)
8) New PID cuts implemented (see PID)
9) Coil pulsing data analysis
- Correction is working fine (Correction)
- NOTE that if
you experience a beam trip during the data taking,
the data are useless.
- In order to save time, in case of a trip, keep the
run going and
just restart Gary's
script (see Trip-coil)
- As a clear relation was found, perform the Coil
pulsing
measurement with Halo target OUT (see Coil-and
Halo)
10) HV adjustement on 2 NA PMTs (see NA-PMT)
11) Most of the cup and plates as well as silverwares are now
cleaned during the runs. Thanks.
On
a more general basis. Mid-Term plan
1) We will likely change the IHWP
state on Tuesday (2/17)
Make a RIP scan just after, and a
Moeller measurement before and after
2) BPM/BCM calibration need to be done every week. Tentative next Wednesday.
3) Fastbus measurement to perform a check of the gain and
set a reference spectra. Tentative : Tuesday 2/17
after beam development
4) Lumi scan on LH2 (asked by Silviu and Jianglai). After BCM
calibration.
Concerns
A) PMT Gain
calibration
- Need reference spectra before going for months of data
taling on LH2
- Some PMT already need some adjustements
B) Coil
modulation
- Small bug to be fixed (resting point is not in the center
of the grid (see Coil))
C) Beam trip is hurting us
- Rates of about 10 trips/hour (see Trips)
- Loss of data is 70s*Ntrip, so about a 20% loss in efficiency
- Beam parity is not causing losses (see Efficiency)
D) Some confusion on fastfeedback
... After discussions and inquiries :
- Energy lock has to be ON
- Position Fastfeedback has to be OFF
List
of shift summaries
Saturday Swing Sa-Swing
and cdaq-SaS
Sunday Owl
Su-Owl
and cdaq-SuO
Sunday Day
Su-Day
and cdaq-SuD