Log entry time 19:31:56 on February 13, 2004
Entry number 76430
keyword=(Happy) RC Summary Thursday/Friday 02/12-13
Run Plan Friday 02-06-2004Run Plan - Wednesday 01-28-2004
RC Summary Thursday/Friday
02-13-2004
Quite a lot of
progress I would say ... Have a look !
- Change to LH2 was made on
Wednesday
morning
- IHWP was
IN until Friday afternoon
- Data taking on LH2 target with 40 uA
- 5.8 hours of LH2
target parity quality
data on tape
(runs
19847-19868)
Achievements during this period:
1) Beam at 40 uA.
2) Run plan defined in coordination with Machine people and completed
- Reduce Halo rates and run the 6 mm halo hole
target (6mm)
- Positions within 0.5 mm of the specifications (BPM)
2) Threshold studies performed
- NA digit from 7 down to 1
- French thresholds from 100 mV down to 50 mV
3) Situation back to normal on the French electronics data stream
and DAQ (disk, network (see Rack))
4) Filtered YO test completed. Runs 19853 and 19854.
5) New IA/PZT automated script available (IntgScript)
6) Energy measurement has been performed (see Energy)
7) Replay of all data to check Feedback convergence
Pretty convincing and encouraging for the IN (HWP-IN)
and OUT (HWP-OUT)
8) 120 Hz data replayed (120Hz)
9) Note on G0Integrity check (G0Integrity)
10) Recovery of data files from last night (Reanalyzed)
On
a more general basis. Mid-Term plan
1) We will likely change the IHWP
state the next Tuesday (2/17)
Make a RIP scan just after, and a
Moeller measurement before and after
2) We
need
people to attend the training provided by Dave and Tanja !!!
3) Energy measurements has been performed on Thursday.
4) BPM/BCM calibration typically every week. Next week.
Concerns
A) NA
Electronics threshold at 40 uA with LH2
- NA data taken at various
thresholds (1
to 7 digits)
- Results seems to confirm a problem with
thresholds with 40 uA beam and Lh2
target
- Possible action is to
lower the thresholds drastically.
- Need more thoughts
but decision to be made rapidly.
B) Beam
position and halo
- After a 4 hours investigation
- Conditions similar to last Saturday has been reached
again
- Need to check stability over the WE
C) FPD 2-14-FL
- Need to look at Fastbus data and TED ToF to confirm changes
List
of shift summaries
Thursday Swing
T-Swing
and cdaq-TS
Friday Owl
F-Owl
and cdaq-FO
Friday Day
F-Day
and cdaq-FD
Serge Kox
Pager : 584-5681
Cellular : 876-1791
e-mail : kox@in2p3.fr