• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Serge

    Log entry time 17:21:34 on February 12, 2004

    Entry number 76288

    keyword=RC Summary 02-12 Wednesday/Thursday

    Run Plan Friday 02-06-2004Run Plan - Wednesday 01-28-2004


    RC Summary Wednesday/Thursday 02-12-2004



     
    Achievements during this period:


    1) Beam at 40 uA.
        - Need some work to reduce Halo rates (a bit too high)
        - Positions within 0.5 mm of the specifications

    2) Threshold studies performed (when  beam quality
    were poor)
        - NA digit from 7 down to 1
        - French thresholds from 100 down to 25 mV
        - Need analysis to draw conclusions or continue

    3) DMCH boards : change VXI slot allocation and cable length (see Cable)
        - Differential linearity optmization of 9 DMCH boards
          (see elog entries DiffLin1 to DiffLin2)
        - News Threshold Files (see Tresholds)
        - Update after board changes (see ddr )

    4) New integration script available (IntgScript)

    On a more general basis

    1) We will likely change the IHWP state the coming Friday
          Make a RIP scan just after, and eventually Moeller measurement

    2) Moeller measurements on Friday too.
      
      We need people to attend the training provided by Dave and Tanja !!!

    3) Energy measurements typically once ... for ever. After discussion with
        Mark Jones to be scheduled after 5 PM on Thursday.

    4)  BPM/BCM calibration typically every week. Next week.

    5) Use no beam time for DNL calibration (NA and French). Also search for
         helicity correlated ground loop. This happen usually often enough ...



    Concerns

    A) Beam position and halo

    B) Halo rates

    I have raised this issue with the PD. People from the machine (optics, injector)
    should meet and eventually ask some G0 expert to come and discuss (Kaz, Julie, ...).
    I would like to have a clear picture of what happened on Sunday Owl which explain
    why we are having these difficulties with the position and halo (not able anymore
    to pass the 6 mm hole).

    C) FPD 2-14-FL




    List of shift summaries
     

    Wednesday  Swing        W-Swing and cdaq-WS
    Thursday Owl                T-Owl and cdaq-TO
    Thursday
    Day                T-Day and  cdaq-TD


    Serge Kox
     Pager : 584-5681
     Cellular
    876-1791
     e-mail : kox@in2p3.fr