Log entry time 21:47:57 on January 20, 2004
Entry number 73897
keyword=Run Coordinator's report - 20 January 2004
Run Coordinator's report - 20 January 2004
What has been done
- During the day on Monday, we took empty target asymmetry data.
- Beginning about 15:48 on Monday, we took helicity feedback device
calibration runs. They were completed around 18:30.
- We took about another 3.5 hours of empty target asymmetry data.
- A verification scan of the frame target was done, taking almost
two hours, ending around 00:00.
- Frame target runs at 15 uA were taken; an IOC crash and poor recovery
required a resteering of the beam in the middle of the frame target
runs.
- Linac problems prevented more than 1/2 hour of empty target data
collection after the frame target was taken out at 05:30
- The beam was set up for Moller measurements beginning around 07:40;
with the Moller measurements occuring from 08:51 until 09:50.
- Other than a short BPM checkout at about 11:00, there has been
no beam in the hall since about 10:00.
Shift Leader Summaries
Paul King
Pager: 584-7194