Run
Coordinator's report - January 11th, 2004
General
concerns :
G0 shifts (leader,
worker) started at noon today.
After being expected for
2 days, 40uA G0 beam was delivered to hall C at 9:15pm today
allowing
Kaz to perform the first part of his parity quality beam study. First
results
can be found in g0log : entries #72780,
#72781
and #72783.
During these studies, no beam was sent to hall A at the same
time.
1h30 later HallA
received 100uA beam while no beam was sent to HallC.
Due to RF
"limitations"
in the injector (120uA total), HallA(100uA)/HallC(40uA) compatibility
test
can't be achieved right away. It only needs a specific "tuning"
from
RF people which is scheduled tomorrow morning starting at
8am.
At midnight, HallA
energy
spread minimization started with 8uA beam. This should last
2hours.
After HallA energy
spread
measurement, we will get the G0 beam back so that Kaz will be able to
continue
his program : RHWP/IA/PZT scans and then perform long feed back runs
(runs
of 1hours each) until MCC will take the beam back for HallA/HallC
compatibility test around 8am.
Depending Accelerator
plan we will decide the more appropriate time to start cooling down our
target which requires a short controlled access and then 2 to 3 hours of
cooling. We will have a better idea after the 7:45
meeting.
DAQ
status :
Following
up g0log entry #72713
, Paul and I have been investigating the problem from 11:30am until
7pm. Steve, Jean-Claude Cuzon have been called. Suspecting ROC3, network
problems (EPICS for the Musson's box), extra TS0 scalers, ... we made
several
DAQ tests (see g0log entries #72763
and #72768)
along which we modified TS0 buffer size and set DMCH1 as the master board
instead of DMCH7 which seemed to cause a problem while running in stand
alone mode. At the end, we were rather frustrated because it worked well
within ts_full run type without understanding what caused the problem.
Such an intermittent problem could reappear anytime... I will investigate
why DMCH7 as the master board in stand alone mode was a problem.
Furthermore,
near the end of our tests, we have seen that even when TS0 was
complaining
it wasn't crashing anymore.
All the DMCH boards have been re-cabled so that the
French
electronics is ready to go.
ts_scaler, ts_fb_epics run types are running
well.
Future
plans :
If
allowed by the PD, taking parasitic ts_scaler runs during hallA/hallC
compatibility
test to be able to look at beam quality.
Take
advantage of the first opportunity to cool our target : requires a short
control access, target experts and Jlab cryo
people.
While
no beam available is scheduled (control access, specific accelerator
studies,
...) : DAQ test with the full time encoding set up (NA + 9 DMCH boards)
using a generator signal sent to some of the splitted channels (NA
octants,
det. 14 and 15) to check TOF obtained with the 2 types of electronics.
Paul and Domi.
When
no beam in the hall is sceduled for a long period of time (at least 2
hours),
perform FR DNL measurements (HV.fullgain_2nd_engineering_calibrated, FR
thresholds 20mV, Reference_FoB, Prescale set to maximum (no fast-bus
events,
30Hz data) .
Once
a day take 120Hz data for 10 minutes (feedback on and
off).
Check
beam quality. Pay attention to halo rates to avoid beam tails when
running
at a beam current below 40uA.
Take
asymmetry data on empty target (gazeous H2) : check the maximum beam
current
we can ask.
Moller
measurement.
Halo
calibration.
As
soon as we will take data on LH2 (40uA, good parity quality beam), take
asymmetry data (40 minutes) with external YO and filtered YO for French
electronics to investigate time bin
correlations.
Dominique
Marchand
pager : 584 - 5474